Present
Eli Cohn, Gary Zimmerman, Mick Cartwright, Toni Schoen, Ann Tannenbaum, Sabin Meyer,
Apologies
Bernice Giscombe
Visitors
Cristina Bloise – Impact Management
Issues for the board or the management company can be emailed to board@washingtonshq.com, or telephone 914 512 8129.
The next meeting is scheduled for August 17th, 8.00pm and will be held at unit 5.
Previous Minutes:
The Board approved the minutes of the last meeting.
Financials
We remain in a good position financially, but need to remain conservative in order to build up reserves in anticipation of future projects
Accompanying these minutes you will see the year end financial statement (our year runs to 6/30). If anyone would like to examine the full details, please contact Eli Cohn for further information
Swimming Pool
Anyone still without the new key should contact Mick Cartwright (917 442 5366) to arrange to pick one up.
There are a number of drain covers around the pool surround which are rusted and need replacing.
ACTION:Â Sabe and Cristina will chase H20 to replace these.
The lower removable windows have been replaced by screens, the upper ones still need doing.
ACTION:Â Cristina will ask Sid to attend to this.
The thermostat controlled windows in the roof are not working.  Similarly the manually controlled side of the roof does not work.
ACTION:Â Christina/Sid will check that all batteries etc are fresh on the thermostat and if this does not resolve the problem, will call in the repair company
ACTION:Â Christina/Sabe will take a look at the manually controlled side and if necessary, call in the repair company.
The front door is showing signs of rust. Mick will check in the records of the recent renovation work and contact the people who did the work to rectify this.
ACTION:Â Mick
Sign In Book: All residents are reminded that they must sign in using the book in the changing area when using the pool. This is an important part of our permit to operate the pool without a lifeguard and may be checked on by Westchester County.
Tennis Court
The tennis court is now open. As a reminder the combination lock is 18-20-6
We are investigating having the sprinklers cover the tennis court more frequently to avoid the surface deteriorating.
ACTION:Â Mick
Gardening
Carlos and his team have been spoken to a number of times regarding our concerns and the service appears to have improved. We will be reminding them to put furniture back in place after they have moved it to clear around it.   If anyone has any concerns please contact Anne (674 1117)
Furniture: Two new benches will be ordered for the garden. The existing furniture will be disposed of.
ACTION:Â Mick
The tree from behind unit 19 has been removed, and the tree in front of unit 2 has been trimmed. Before paying the invoice, we need to confirm that the trimming was done well enough.
ACTION: Cristina
Sabe mentioned that he may have details of a company based in Northern Westchester who may be a better alternative for future tree work.
ACTION:Â Sabe to get contact details.
Anne got quotes for additional sprinklers to cover the area behind the tennis courts. The cost is prohibitive and we are investigating whether existing sprinklers could be switched from directional to 360 degree to cover the area, or whether alternate ground cover could be used that does not need sprinklers to survive.
Drains Repair
The drainage behind units 9 – 13 has been repaired.
Outside Lighting
We continue to investigate the outside lighting to improve the illumination in the common areas.
ACTION:Â Cristina to meet with electrician
ACTION: Cristina/Sid to check all light bulbs. Known as out are the lights by parking spaces 8/10
By Laws Review
All board members are requested to send additions, corrections and changes to the draft submission to Mick.  Mick will then compile and circulate for discussion at the next board meeting.
ACTION:Â All to send notes to Mick
Driveway
We will be moving ahead with Tri State Asphalt.  Two speed humps will be installed as part of the work. The work will require us to park off site for a 48 hour period.   We will give as much notice as possible of the dates affected.
ACTION :Â Mick to schedule work with Tri State.
We will be moving the sign for 4/5 parking to the area beside the swimming pool and putting up a visitors parking sign in the spaces freed up.
ACTION: Eli/Cristina to find out who supplied the old signs.
Front Wall
We continue to meet with engineers to develop a plan of action for the wall.
ACTION:Â Toni to attempt to contact contractor that replaced the section of wall near the stream
Any Other Business
There is often garbage left around the bus stop near the exit. We will try and find out who would be responsible for placing a garbage can there.
ACTION:Â Cristina to contact the bus company and Dobbs Ferry town.
Annual General Meeting
Tentative date, Tuesday September 14th.
Respectfully Submitted,